The October workday took place in the Hall o'the Heath Farm orchard. Tools provided via Alistair of the Cheshire East Ranger Service. The plan was to cut back the hedges and overgrown grass and brambles to reduce competition for the fruit trees. The crop of apples appears to have been quite good this year.
Sunday, 2 October 2011
Saturday, 1 October 2011
October work and field trip
Message from Ron...
"Hi Everyone,
We have a busy weekend starting with the field trip this Saturday, 1st
October. We'll be heading out to Lathkill Dale to walk the full length of the
dale from Moneyash to Haddon and return, a distance of about 8 miles. Walking
boots are recommended. Please be at Waterloo Road car park for a 9.00am
start.
Next day, Sunday, October 2nd is a workday and we'll be at Hall o'the Heath
for a general tidy-up of the orchard and hazel copse plus some work on the
wildlife garden. All being well, Alistair will join us.
See you soon,
Ron."
Sunday, 4 September 2011
Hazel Tun
The fruit of the hazel ripening. This forms the symbol for the Haslington Conservation Volunteers and several other Haslington based groups. The hazel being the probable source of our village name - see the Wikipedia entry for Haslington.http://en.wikipedia.org/wiki/Haslington
September workday
The September workday pictures seem to involve members in cages. First Chris is reducing the undergrowth around an oak tree planted about 15 years ago. Then Ron ends up in another cage cutting the barbed wire to ensure another oak tree has a chance of a stress free growth for the next 20 plus years. 

Colin and Dave were also busy with a ladder checking on many of the HCV bird boxes nearby - disturbing the odd squirrel.
Wednesday, 31 August 2011
September workday 4th Sept
A message from Colin about this weeks HCV task.
"Dear all,
Just a quick reminder that autumn starts on Thursday (although it feels like we have been in it for a few days!) and Sunday is our next workday.
We will be working at John Cowap's Hall Farm checking and adjusting the tree protection around all the trees we have planted, as well as trimming round the edges so that the trees do not get flailed when the hedge is done. If numbers allow I would also like to check as many nest boxes as possible.
Hope to see you all then
best wishes
Colin"
Saturday, 2 July 2011
July workday
A message from project leader Ron
"Hi everyone,
Hoping to see you all this Sunday for our workday. We will meet up as last time at Waterloo Road car park and walk up to Robert's field where we'll planting an oak tree and providing barrier protection. There will be a dead elder to remove to make a gap for the tree barrier.
Regards,
Ron. "
So see you at 09:00 on the car park.
"Hi everyone,
Hoping to see you all this Sunday for our workday. We will meet up as last time at Waterloo Road car park and walk up to Robert's field where we'll planting an oak tree and providing barrier protection. There will be a dead elder to remove to make a gap for the tree barrier.
Regards,
Ron. "
So see you at 09:00 on the car park.
Saturday, 4 June 2011
June Workday
The June workday starts at 09:00 on June 5th 2011.
A message from Ron
"Just to remind you all that this Sunday is a Volunteers workday. We will be in Robert Leech's field fitting a gate on the footpath. We will meet, as usual, on Waterloo Road car park and walk up to the field. Colin will be picking up the gate and post from Hall o'the Heath and the rest of us will use the handcart and take all the necessary tools to the work site. We will need to remove the existing stile and we can make a start on that while Colin is at Hall o'the Heath.
Hope you can all make it."
See you there.
A message from Ron
"Just to remind you all that this Sunday is a Volunteers workday. We will be in Robert Leech's field fitting a gate on the footpath. We will meet, as usual, on Waterloo Road car park and walk up to the field. Colin will be picking up the gate and post from Hall o'the Heath and the rest of us will use the handcart and take all the necessary tools to the work site. We will need to remove the existing stile and we can make a start on that while Colin is at Hall o'the Heath.
Hope you can all make it."
See you there.
Sunday, 10 April 2011
Bird Boxes 2011
Bird box making at the Zan Industrial Park with the Haslington Conservation Volunteers, April 2011.
Stage 1 was treating the timber with either green or brown fence preservative. The planks were then cut up into appropriate lengths to form a kit of parts for each box. This all happened prior to the Sunday work day.
Holes of either 30 or 32 mm were drilled in the front panel as the sides, base and front were screwed together onto the back piece. The lids are held in position with short narrow strips of wood, to hold the lid squarely in position.
The boxes will need a quick second coat of preservative and they will be ready for sale on the village fun day.
Friday, 8 April 2011
Workday for April 10th
A message from Colin.
"A quick reminder that the next workday is this coming Sunday, the second Sunday of the month instead of the usual first. The task is to make 20 nest boxes (or as many as possible in the time) ready for sale at the Village fun day in May. All materials have been delivered to Richard at the Zan Works and he and Dave are planning to do some prep work there beforehand.
Ron will almost certainly not be fit enough to attend and I am doubtful. It seems sensible on this occasion to assemble at the Zan Works directly on Sunday so unless you hear anything else on the topic, please be there around 09-00 or just after. "
I will try and be there to open up for 09:00. Richard
"A quick reminder that the next workday is this coming Sunday, the second Sunday of the month instead of the usual first. The task is to make 20 nest boxes (or as many as possible in the time) ready for sale at the Village fun day in May. All materials have been delivered to Richard at the Zan Works and he and Dave are planning to do some prep work there beforehand.
Ron will almost certainly not be fit enough to attend and I am doubtful. It seems sensible on this occasion to assemble at the Zan Works directly on Sunday so unless you hear anything else on the topic, please be there around 09-00 or just after. "
I will try and be there to open up for 09:00. Richard
Saturday, 5 February 2011
February 2011 Workday
Message from Ron
"Hi Everyone,
I hope to see you on our next workday which is 6th February. We will be working on the hazel coppice in Robert Leech's field, off Waterloo Road. We will meet, as usual, at the car park at 9.00am and then walk down to the site. Colin and Sarah will not be with us and we will be working without a ranger. Christine Redstone from Alsager should be with us mid-morning to collect the coppiced hazel. Hope you can make it.
Regards,
Ron."
"Hi Everyone,
I hope to see you on our next workday which is 6th February. We will be working on the hazel coppice in Robert Leech's field, off Waterloo Road. We will meet, as usual, at the car park at 9.00am and then walk down to the site. Colin and Sarah will not be with us and we will be working without a ranger. Christine Redstone from Alsager should be with us mid-morning to collect the coppiced hazel. Hope you can make it.
Regards,
Ron."
Sunday, 9 January 2011
January 2011 Crewe Green Church hedge
The hedge alongside the churchyard extension at Crewe Green Church has been a project for the HCV for several years. We have layed the hedge to ensure a strong thick barrier from the adjoining farmers field. This year it was time for a severe trim, leaving selected hedgerow trees with sufficient space to grow into maturity.
Our Cheshire East ranger used his chainsaw to cut back the larger branches, whilst Chris trimmed the thinner growth.
The major task was clearing the cut branches from approx 100m of hedge. The waste was moved the area next to the car park and reduced in volume by careful use of the chainsaw.
Our Cheshire East ranger used his chainsaw to cut back the larger branches, whilst Chris trimmed the thinner growth.
The major task was clearing the cut branches from approx 100m of hedge. The waste was moved the area next to the car park and reduced in volume by careful use of the chainsaw.Sunday, 5 December 2010
December 2010 Workday
The December workday required the collection and disposal of various lumps of fallen branches as part of a tidy up around the orchard at Hall o'the Heath farm. Chris and Dave had prepared baked potatoes that required heating up ready for an early lunch whilst the frost and snow were still around.
Baked Potatoes cooking on our traditional December bonfire.
Subscribe to:
Posts (Atom)












